A freelance change order records an agreed change to an existing project: what is being added or removed, how the price changes, what happens to the schedule, and who approves it. Send it before doing the extra work, and keep the accepted version with the original agreement.
A useful change order can fit on one page. It does not need to repeat your entire contract; it needs to make the new decision unambiguous. Download the free change order template, then use the example below to fill it in.
First decide whether the request is actually extra
Compare the request with the signed scope, approved brief, acceptance criteria, and revision allowance. A new deliverable is different from correcting your own mistake. If the brief promised a working contact form and yours is broken, fixing it is generally part of delivering the promised work, subject to your agreement.
If a client asks for a booking system when the agreed deliverable was a contact form, that is a different task. If the wording is ambiguous, resolve the ambiguity together before treating your interpretation as a billable entitlement. The statement of work versus change order guide explains which document should hold which decision.
Include these eight fields
- Reference: project name, client, original agreement date, and change order number.
- Request: the specific change and who requested it.
- Deliverables: what you will supply, with quantities and acceptance criteria.
- Boundaries: what remains excluded and what is being replaced or removed.
- Price: the added or reduced fee, currency, applicable taxes, and payment timing.
- Schedule: affected milestones, dependencies, and revised delivery dates.
- Approval: the authorized decision maker and the acceptance method required by your agreement.
- Validity: how long the quote and proposed slot remain available.
Avoid “additional website work: $600.” It leaves both the work and the finish line open. Describe the output a client can recognize.
Free change order template
Copy this into a document and replace every bracketed field. This is an operational starting point; contract requirements and enforceability depend on the agreement and applicable law.
CHANGE ORDER [number] — [project]
Prepared: [date]
Client / service provider: [legal names]
Original agreement: [title, date, reference]
Requested change:
[What changed and why.]
Added or revised deliverables:
[Specific outputs, quantities, and acceptance criteria.]
Removed work / exclusions:
[What is removed, unchanged, or outside this change.]
Fee adjustment:
[Currency and amount; increase or reduction.]
Tax treatment: [applicable taxes or to be confirmed]
Revised project total: [original total + net changes]
Payment timing: [deposit / invoice date / due date]
Schedule:
Original affected milestone: [date]
Revised milestone: [date]
Client inputs needed by: [date and items]
Approval:
[Authorized names and acceptance method.]
Work on this change starts after [approval / agreed payment].
Quote and delivery slot valid until: [date]
All other terms remain as stated in [original agreement],
except the specific changes recorded above.
Client acceptance: [name, signature or agreed method, date]
Provider acceptance: [name, signature or agreed method, date]Worked example: two extra landing pages
Suppose a five-page website is already agreed at $3,000. The client requests two campaign landing pages. An illustrative change order might add two pages using the existing design system, one consolidated revision round, and client-supplied copy. It could exclude new branding, copywriting, and additional integrations.
If you quote $700 for that work, the revised project total is $3,700 before any applicable tax. That is example arithmetic, not a recommended market price. Base your actual quote on the work, responsibility, testing, and capacity involved.
The date change deserves equal attention. Write “delivery moves from November 20 to November 25, provided approved copy arrives by November 12.” Avoid promising a new deadline while leaving the required inputs unspecified. If the client needs the original date, discuss replacing another deliverable or reducing the addition.
Send a short approval message
Thanks for the additional landing-page brief. I’ve attached Change Order 02 with the two pages, added fee, and revised delivery date. Please review the scope and approve using the method shown before I book the work. If you need to keep the original budget or date, I can suggest a smaller version.
A positive comment such as “looks interesting” is not a clear instruction to start. Check that acceptance covers the actual version, fee, and timetable. Save the approved record so later edits cannot obscure what was accepted.
After approval, update the working records
Update the task list, milestones, budget, and invoice reference together. Keep the original scope available rather than silently rewriting project history. If the change is declined, continue with the agreed scope and record that decision too.
When you invoice the extra work, cite the change order number and accepted deliverables. If payment later becomes overdue, use the unpaid-invoice follow-up scripts and attach the relevant records. A clear approval trail supports a factual conversation, though it cannot guarantee payment.
Can you issue a change order after the work is done?
You can document what happened, but retrospective paperwork does not turn an unapproved fee into an agreed one. Explain the work honestly, discuss the amount, and seek a clear agreement. For the next request, stop at the decision point before spending the time.
If you want the added work, price, and client decision in one place, that’s what Clearcut is built for.