Charge for extra revisions by defining what the original fee includes, identifying the additional work, and getting written agreement to its price before you begin. Use a fixed fee for a clear batch, an hourly rate with a cap for uncertain work, or a new project quote when the request changes the direction substantially.

Do not surprise a client with a revision fee after delivery. If your original terms never set a revision limit, discuss a boundary for the remaining work rather than inventing one retroactively.

Define a revision round before counting one

A revision round can mean one consolidated set of feedback from the authorized client approver on a specific version, followed by your implementation and return of that version. Explain what types of changes fit the agreed direction.

Separate three cases:

  • Correction: work needed because the delivery missed agreed requirements.
  • Included revision: a refinement within the agreed direction and remaining allowance.
  • Scope change: another deliverable, a new direction, or work beyond the agreed allowance.

The classification is about the agreement and circumstances. “Round three” is not automatically chargeable if round two still contains your own uncorrected mistakes.

Choose a pricing method

MethodUseful whenState explicitly
Fixed revision feeFeedback is complete and boundedIncluded edits, fee, and any review allowance
Hourly with a limitEffort is uncertain but can be trackedRate, estimate, cap, and approval before exceeding it
Additional revision packageSeveral similar rounds are foreseeableNumber of rounds, boundaries, and expiry if applicable
New scope quoteBrief or creative direction changesDeliverables, discovery, milestones, and replaced work

Estimate the work required to review feedback, make changes, test the result, communicate, and deliver. Do not price only the minutes spent moving elements on a screen.

For an illustrative calculation, three hours of revisions plus one hour of checking at $75 per hour totals $300 before taxes. That is a worked example, not a market rate recommendation. A fixed fee also needs a clear boundary so it does not become an unlimited promise.

Wording to include in a proposal

The project includes [number] revision rounds on [deliverables]. Each round consists of one consolidated feedback list from [approver] on the current version. Additional rounds or changes to the approved direction will be quoted separately and begin only after written approval. Corrections required to meet the agreed specifications are handled under the original agreement.

Adapt this to your service and have material contract language reviewed for your jurisdiction when needed. The point is to agree the process before either side depends on it.

Wording when the included rounds are used

Thanks for the feedback. We’ve completed the [number] included rounds. The additional changes listed below would cost [amount and currency] and move delivery to [date], assuming approval by [date]. This covers [specific edits]. Please confirm whether you’d like to proceed, or whether we should finalize the current version.

List the edits beneath the message. A client should not need to guess which comments are covered by “the changes.”

Wording when the request changes the direction

The new reference changes the direction we approved on [date]. I can develop that direction, but it requires [new work] beyond the current revision scope. I’ll prepare a separate quote showing the revised deliverables and schedule before starting.

Keep judgment out of the message. The client may have a legitimate business reason to change direction. Your job is to explain the commercial consequence, not punish the change.

Wording when your original scope was unclear

I can see we did not define the revision process clearly enough. Let’s agree the remaining changes in one list. I propose completing [bounded work] under the current fee, then quoting any further additions before starting them.

Only offer that compromise if you can support it. You might instead need a discussion about a larger new direction. Acknowledging ambiguity does not require accepting unlimited work.

Record the approval and invoice clearly

Use the change order template to record the specific version, edits, fee, and timetable. Save the approved feedback list. If new comments arrive during implementation, compare them with that list instead of quietly absorbing them.

The invoice should identify the approved change and show any deposit or payment already received. For follow-through after the due date, use the invoice reminder scripts; do not treat a payment promise as a confirmed receipt.

Should you ever waive a revision fee?

Yes, if you choose to and can afford the work. It may be a goodwill adjustment or a practical way to resolve an unclear brief. State the exception clearly and avoid implying the same allowance will continue indefinitely.

For persistent requests, use the scope-boundary wording to offer a paid addition, a scope swap, or completion of the current version. The best system makes the next decision easier for both sides.

If you want to turn the next revision request into a clear change quote, Clearcut is designed for that decision.